Case Study
Project overview
Mr. Abbott partnered with us to upgrade his home’s heating and energy system, replacing an outdated Worcester Bosch combination boiler with sustainable alternatives. This included installing an 8.5 kW Mitsubishi Ecodan Air Source Heat Pump, a 200L Joule heat pump cylinder for hot water, and integrating 14x 405W Longi Solar panels with an Alpha ESS Hybrid inverter and two 5.7 kWh batteries. Additionally, Mr. Abbott was able to benefit from the £7500 Boiler Upgrade Scheme voucher, significantly supporting the cost of installation.

Client Background
Seeking to reduce his carbon footprint and lower energy costs, Mr. Abbott was eager to embrace innovative solutions that would enhance energy efficiency and sustainability in his home.

Name – Mr. Abbott

Location – Mold

Exclusive Offer
Take advantage of the £7500 Boiler Upgrade Scheme voucher to make your upgrade even more affordable!

Mr. Abbot
Solution Provided
We recommended the Mitsubishi Ecodan Air Source Heat Pump for its reliability and efficiency in diverse weather conditions.
Coupled with the Joule heat pump cylinder, this system ensures ample hot water supply while drastically reducing energy consumption compared to traditional heating methods. The integration of Longi Solar panels and the Alpha ESS Hybrid inverter allows Mr. Abbott to maximize renewable energy use and further decrease utility expenses.

Installation Process
Our team meticulously planned and executed the project, ensuring minimal disruption to Mr. Abbott’s daily life. Key steps included:

Removing the old boiler and preparing the installation site.



Outcome and Benefits
Following installation:

Mr. Abbott immediately saw savings on his energy bills due to the efficiency of the Mitsubishi Ecodan Heat Pump and reduced reliance on grid electricity.




Challenges and Solutions
During the project, we faced specific challenges related to Mr. Abbott’s existing microbore pipework in the central heating system. Careful consideration was required when designing the replacement radiators due to the system’s low design temperatures. Our solutions included:

Conducting thorough assessments of the existing microbore pipework to ensure compatibility with the new heat pump system.

Designing and installing radiators that could efficiently operate at lower design temperatures, optimizing the performance of the Mitsubishi Ecodan Heat Pump.

Collaborating closely with Mr. Abbott to address any concerns and ensure the new system met his heating requirements without compromising efficiency.
Conclusion
The installation of the Mitsubishi Ecodan Air Source Heat Pump, Joule heat pump cylinder, Longi Solar panels, and Alpha ESS Hybrid inverter has transformed Mr. Abbott’s residence into a beacon of sustainable energy efficiency. By replacing his old boiler with cutting-edge technology and leveraging renewable energy sources, we’ve significantly reduced his environmental impact while enhancing his comfort and financial savings.